铸铁平台的使用和安装步骤介绍
时间:2016/1/5 15:38:22
浏览量:545
1.使用之前,先进行安装调试,以防损坏铸铁平台的工作面;
2.使用过程中要注意防潮、防腐蚀,同时注意不要将铸铁平台放于过高和过低的温度环境下存放;使用环境:
使用地点
|
|
海拔高度
|
<1000M
|
最高温度
|
+40℃
|
最低温度
|
-5℃
|
最大日温差
|
15K
|
相对温度(在20℃时)
|
95%
|
安装地点
|
室内
|
运行方式
|
连续运行
|
3.工件的重量不要超过铸铁平台的额定载荷,以免造成工作质量降低以及损坏铸铁平台的结构使之变形。
4.在铸铁平台使用完毕后,应将其清洗干净,同时作好防锈工作。
一般铸铁平台的使用寿命很长,只要采用正确的方法使用和存放,铸铁平台工作面的精度可以保持使用2年以上,当精度降低时可以通过调试或刮研工艺恢复。
铸铁平台的安装步骤介绍
1、垫铁安装:铸铁平台调至水平、负荷均匀分布于各支点上。环境温度(20±5)℃。使用时应避免振动。铸铁平台采用垫铁安装的优点,安装快捷、移动方便。
2、支架安装:铸铁平台轻放到支架上、调整支架上的微调螺栓至到铸铁平台水平。支架可减轻检验人员的劳动强度。支架高度一般在500-600mm左右。
3、地锚器安装:铸铁平台可以设计地锚器安装,首先用户根据铸铁平台的图纸做好地基和预埋孔,然后把地锚器放到提前设置的预留孔里,将铸铁平台调整水平,
4、地脚螺栓安装:铸铁平台根据用户的要求设计安装方式,地脚螺栓安装。
Introduction to the use and installation steps of cast iron platforms
1. Before use, first install and debug to
prevent damage to the working surface of the cast iron platform;
2. Pay attention to moisture and corrosion
during use, and be careful not to store the cast iron platform in too high or
too low temperature environment; use environment:
使用地点Operation
mode
|
|
海拔高度Altitude
|
<1000M
|
最高温度Maximum
temperature
|
+40℃
|
最低温度lowest
temperature
|
-5℃
|
最大日温差Maximum daily temperature difference
|
15K
|
相对温度(在20℃时)Relative temperature (at 20 ° C)
|
95%
|
安装地点Installation
Location
|
室内indoor
|
运行方式place
of use
|
连续运行continue
to operate
|
3. The weight of the workpiece should not
exceed the rated load of the cast iron platform, so as to avoid the work
quality degradation and damage to the structure of the cast iron platform.
4. After the cast iron platform is used, it
should be cleaned and rust-proof work.
Generally, the service life of the cast
iron platform is very long. As long as the correct method is used and stored,
the precision of the working surface of the cast iron platform can be
maintained for more than 2 years. When the accuracy is lowered, it can be
recovered by debugging or scraping process.
Introduction to the installation steps of the cast iron platform
1. Bracket installation: The cast iron
platform is lightly placed on the bracket, and the fine-tuning bolts on the
bracket are adjusted to the level of the cast iron platform. The bracket can
reduce the labor intensity of inspectors. The height of the stent is generally
about 500-600 mm.
2. Ground Anchor Installation: Cast iron
platform can be designed to install ground anchor. First, according to the
drawings of cast iron platform, users can make foundation and pre-embedded
holes, then put the ground anchor in the pre-set reserved holes, and adjust the
level of cast iron platform.
3. Installation of cushion iron: Cast iron
platform is adjusted to level and load is evenly distributed on each fulcrum.
The ambient temperature is (20 +5)degrees Celsius. Vibration should be avoided
in use. Cast iron platform has the advantages of cushion iron installation,
fast installation and convenient movement.
4. Installation of anchor bolts: Cast iron
platform is designed and installed according to user's requirements, and anchor
bolts are installed.
Company name: botou zhuoyuan mechanical equipment manufacturing co.,LTD
Registered
address: jiaohe development zone, botou city, hebei province
Fax
number: 0317-8031093
Contact
information: 15369812793 (WeChat with the same number) liansheng chu
Postcode:
062151
Enterprise
email:
1358827475@qq.com
Account
Opening Bank: Botou Branch of Bank of China
Account
number: 100399943203
Agricultural
bank account number: 6228481739059615270http://zhuoyuanjixie.com